image
image
image
image
Trolley

TY140 140A 140B Gas Cylinder Sack-Truck Trolley

TY140 140A 140B
Quantity:
Contact Now
add to cart
All Products

TY140 140A 140B Gas Cylinder Sack-Truck Trolley

This 4-Wheel Gas Cylinder Sack-Truck Trolley, designed to safely and effortlessly transport one or two gas cylinders on a four-wheeled base. This design effectively reduces operator fatigue and ensures the pressurized cylinders are moved safely, adhering to HSE guidelines. Another critical safety feature of this trolley is its open design, ensuring that the gas cylinder is not enclosed during transit.

Equipped with a retaining chain, horizontal bars, and a vertical frame, the trolley guarantees the secure placement of the gas cylinder during transit. Meanwhile, the two wheels and rear castor enable remarkable maneuverability of the trolley.

Notably, the two rear wheels can be folded, transforming the trolley into a conventional sack truck for ergonomic use.

ModelTY140TY140ATY140B
Materialcarbon steelSS201 stainless steelSS304 stainless steel
Capacity280280280
Max.diameter of bottle∅300-500∅300-500∅300-500
Front wheelRubber∅200*50Rubber∅200*50Rubber∅200*50
Rear wheelPU∅75*30
Net weight252121
 
 
 
 
 
 
 
 
 

 
 
2026-09-30
Before Installation Begins: Getting Materials to the Right Height
A suitable material lift helps address this part of the work. Choosing one starts with understanding the installation task and the space in which it will take place.
2026-09-29
How Do You Grip a Roll Securely While Protecting Its Surface?
A roll can reach the production line and still arrive in the wrong condition. Scuffed outer layers, damaged edges or visible pressure marks may mean additional inspection before the material is ready for use. For printing and packaging operations, the condition of the roll at delivery deserves as much attention as the journey itself.
2026-09-28
SINOLIFT CPD500-R720 Electric Clamping Truck for Smoother Roll Handling
A roll can move through several stages before it reaches a production machine. It may arrive in storage upright, travel across the factory, and then need to be raised and turned for the next process. For printing, packaging and material-processing operations, each transition calls for careful control of a heavy cylindrical load.
2026-09-28
From Pallet to Production with the SINOLIFT CTD350-R720
The next roll is waiting beside the production line, but getting it ready for use can take more effort than expected. It needs to be moved off a pallet, brought closer to the machine, raised to the receiving position and turned to the correct orientation. In printing and packaging workshops, these small handling steps repeat throughout the day. When each step requires a different tool or additional manual effort, a routine material change can become an interruption to production.
DOWNLOAD
Downloads
2024-09-18
SINOLIFT T20 T20i pallet truck
Downloads
Downloads
2024-09-24
SINOLIFT OPC03M order picker
Downloads
Downloads
2024-09-27
SINOLIFT EPT15 EPT18 EPT20 pallet truck
Downloads
Downloads
2024-09-27
SINOLIFT EPT20E EPT20ES pallet truck
Downloads