SD Series Drum Dolly
SD
- Drum Dollies to move and position 30 or 55-gallon steel or plastic drums;
- Steel frame drum dolly painted red;
- SD55C、SD55D is stainless steel material;
- Steel frame drum dolly painted red;
- SD55C、SD55D is stainless steel material;
Quantity:
Name:
SD Series Drum Dolly
Features of Drum Dolly:
• Strong and durable Drum dolly easily transports up to 55 gallon drums
• Includes 4 – 3in. swivel casters for stability and easy maneuverability
• Welded steel frame with durable powder-coat finish for durability
• Cross strap frame design helps secure loads to prevent tipping and potential spills
• Includes 4 – 3in. swivel casters for stability and easy maneuverability
• Welded steel frame with durable powder-coat finish for durability
• Cross strap frame design helps secure loads to prevent tipping and potential spills
| Model | SD55A | SD55B | SD55C | SD55 | SD55D | SD55E | SD55F | |
| Capacity | kg | 350 | 450 | 410/900 | 350 | 350 | 350 | 500 |
| Drum Size | 55gallon(Ø572x900)steel,210Lplastic | 30gallon(Ø450x700)-55gallon(Ø572x900)steel,210Lplastic | ||||||
| Overall dimension | mm | Ø610x150 | 700x700x150 | Ø610/Ø23.75 | 680x680x150 | 700x700x150 | 700x700x150 | 630x630x150 |
| Wheel size | mm | ø75 | Ø75x35 | ø75 | ||||
| Net weight | kg | 9.4 | 9.8 | 7.2/15 | 9 | 10 | 11 | 9 |







2026-09-29
How Do You Grip a Roll Securely While Protecting Its Surface?
A roll can reach the production line and still arrive in the wrong condition. Scuffed outer layers, damaged edges or visible pressure marks may mean additional inspection before the material is ready for use. For printing and packaging operations, the condition of the roll at delivery deserves as much attention as the journey itself.
2026-09-28
SINOLIFT CPD500-R720 Electric Clamping Truck for Smoother Roll Handling
A roll can move through several stages before it reaches a production machine. It may arrive in storage upright, travel across the factory, and then need to be raised and turned for the next process. For printing, packaging and material-processing operations, each transition calls for careful control of a heavy cylindrical load.
2026-09-28
From Pallet to Production with the SINOLIFT CTD350-R720
The next roll is waiting beside the production line, but getting it ready for use can take more effort than expected. It needs to be moved off a pallet, brought closer to the machine, raised to the receiving position and turned to the correct orientation. In printing and packaging workshops, these small handling steps repeat throughout the day. When each step requires a different tool or additional manual effort, a routine material change can become an interruption to production.
DOWNLOAD
2024-09-18
SINOLIFT T20 T20i pallet truck
2024-09-24
SINOLIFT OPC03M order picker
2024-09-27
SINOLIFT EPT15 EPT18 EPT20 pallet truck
2024-09-27
SINOLIFT EPT20E EPT20ES pallet truck
Comprehensive score