image
image
image

FJA750 Fixed-short Type Responsive Jib Crane Forklift Parts Portable Cantilever Hoist

FJA750
Quantity:
Contact Now
add to cart
All Products

Super traction

super load-bearing capacity, maximum working maximum 7500kg

Anti-rust spray paint

 galvanized surface paint, mechanical arm surface spray paint or galvanized treatment, to prevent delaying metal rust, while making the appearance of the mechanical arm beautiful

scope of application

This 4500 kg long triangular arm is a universal vertical triangular arm ideal for crossing pits and areas where the forklift cannot not travel as the forklift can reach 3.5 m when fully extension. The total length at closure is 2.0 m.

technical specifications

Safe working load (SWL) max. 4500kg. Unit weight 140kg load center 870mm Packaging size 185 x 65 pocket center 290mm

The fixed cantilever allows for an additional lifting height, with the extension beam just above the fork pocket. Widely used, easy installation, supply alloy unloading

The total length was 1.3m at contraction and 2m at extension.

Specification

ModelFJA750
Working load limit (WLL) 7500kg
Net weight390kg
Pocket size230*110mm
Surface treatmentpainted or galvanized finish
PositionP1P2P3P4
Extension(mm)1275145519202390
Working load limit (WLL) 7500750075007500
 
2026-09-30
Before Installation Begins: Getting Materials to the Right Height
A suitable material lift helps address this part of the work. Choosing one starts with understanding the installation task and the space in which it will take place.
2026-09-29
How Do You Grip a Roll Securely While Protecting Its Surface?
A roll can reach the production line and still arrive in the wrong condition. Scuffed outer layers, damaged edges or visible pressure marks may mean additional inspection before the material is ready for use. For printing and packaging operations, the condition of the roll at delivery deserves as much attention as the journey itself.
2026-09-28
SINOLIFT CPD500-R720 Electric Clamping Truck for Smoother Roll Handling
A roll can move through several stages before it reaches a production machine. It may arrive in storage upright, travel across the factory, and then need to be raised and turned for the next process. For printing, packaging and material-processing operations, each transition calls for careful control of a heavy cylindrical load.
2026-09-28
From Pallet to Production with the SINOLIFT CTD350-R720
The next roll is waiting beside the production line, but getting it ready for use can take more effort than expected. It needs to be moved off a pallet, brought closer to the machine, raised to the receiving position and turned to the correct orientation. In printing and packaging workshops, these small handling steps repeat throughout the day. When each step requires a different tool or additional manual effort, a routine material change can become an interruption to production.
DOWNLOAD
Downloads
2024-09-18
SINOLIFT T20 T20i pallet truck
Downloads
Downloads
2024-09-24
SINOLIFT OPC03M order picker
Downloads
Downloads
2024-09-27
SINOLIFT EPT15 EPT18 EPT20 pallet truck
Downloads
Downloads
2024-09-27
SINOLIFT EPT20E EPT20ES pallet truck
Downloads